Principle 10. Preliminary action
- Perform, before it is needed, the required change of an object (either fully or partially).
Pre-pasted wall paper
Sterilize all instruments needed for a surgical procedure on a sealed tray.
- Pre-arrange objects such that they can come into action from the most convenient place and without losing time for their delivery.
Kanban arrangements in a Just-In-Time factory
Flexible manufacturing cell