Principle 10. Preliminary action

  1. Perform, before it is needed, the required change of an object (either fully or partially).
    Pre-pasted wall paper
    Sterilize all instruments needed for a surgical procedure on a sealed tray.
  2. Pre-arrange objects such that they can come into action from the most convenient place and without losing time for their delivery.
    Kanban arrangements in a Just-In-Time factory
    Flexible manufacturing cell